January 20th, 2011
Hydro line could run under lake
Study looks at what may come after Bipole III The not-yet built Bipole III will be maxed out once the next generation of dams is constructed, raising the spectre of a fourth mega-power line and reviving the idea of an underwater route. A 200-page report on the viability of a




